At the end of July we built, stained/polyurethaned the bathroom window casings and as well as put up the white trim. First photo is the main bathroom that connects to our bedroom.
This is the guest bathroom. I still have to fill nail holes, but that can wait till I'm bored.Some of the other bathroom things I've done is adding 2 robe hooks to the back of the main bath door. That is Hal's walk-in closet to the right.And since there wasn't a tall enough space under the window for a traditional towel bar, I put 2 rings behind the door in the guest bath.
The baseboard trim is all done in the guest bath as well. Main bath is still awaiting it.
No comments:
Post a Comment