We installed an entire row of OSB today plus another sheet and one half in the next row. After that we were cold and there wasn't anymore ready to install anyway. Thirty six degrees inside the house today.
Saturday, February 20, 2021
A Little More Sub Floor
We've had a little cold snap the last couple of weeks, not as bad as some in the past but highs in the low 20s or teens) and single digits at night, plus more snow and mostly cloudy days, does not make for comfortable temps in an uninsulated metal building. However, we did manage to finish the subfloor along the back of the house. This covers the master bedroom in the far corner and most of the living room in the center and most of the kitchen in the foreground.
The next thing that happened was Hal attached the metal tension bridging across the tops of the floor joists in the next 12' x 48' section. Then the cold snap hit and it wasn't till this past week it was warm enough for him to crawl along underneath the joists to nail the bottom side while I made sure the boards stayed at 16" on center. It is amazing how sturdier this makes the floor.![]() |
| Tension Bridging |
Thursday, February 4, 2021
Christmas 2020
Neither I nor my sis became sick, one of us if not both usually get some type of flu. I cannot attribute to robust immune systems so much as to the fact people who were actually sick with whatever stayed home!
But back to Christmas. We had 2 guests for Christmas dinner, my friends from Barton City, John and Tom, we had ham and lots of sides and of course, pies for dessert. No one went hungry and everyone seemed pleased.
Wednesday, February 3, 2021
House Build Update
Well, better late than never.
We haven't been totally negligent in the house build since my last post, though we did take off 3 weeks for the holidays while my younger sister visited.
First thing we did after the concrete garage floor went in was to install the garage doors so that we are really closed in. No more wind or weather blowing in. We haven't installed the ceiling tracks as there isn't a ceiling to attach them to so they don't operate yet, but it's a start.
First door installed in November 2020.The garage door for Hal's truck
Then Hal added temporary lighting in the garage so we can work then started putting up the walls in the garage for the utility room and his workshop. Above is the workshop.
These walls also have wiring in them for outlets and ceiling lights.
Friday, October 23, 2020
Rough Plumbing and Electrical - Under the Floor
Hal has been busy a few days now. Occasionally he needs my help to pull wire or play gopher but mostly it's a one person show. He has been installing copper pipe for the cold water feeds to both kitchen sinks and red PEX for hot water and blue PEX for cold water everywhere else. The reason for the copper rather than PEX everywhere are the possible chemical leaching into water from PEX that some claim can happen (like the state of CA which has banned PEX altogether). We usually only get drinking water for tea coffee, cooking, etc out of the cold tap in the kitchen anyway, so why not play it safe. So here are a few pics of the piping.